插件说明: Kinding rail station is a fully functional 4 track passenger rail station with 2 platforms, providing a capacity of 7.500, bus functionality and TE parking lots. air pollution: 5 over 4 tiles water pollution: 3 over 3 tiles garbage: 8 over 0 tiles power consumed: 15 kWh/month water consumed: 11m?/month Transit Switch Entry Cost: 0,075 capacity: 7.500 plop cost: 500 monthly cost: 50